| Electricity Distribution and Transmission Improvement Project
|
![]() |
| |
![]() |
|
The objectives of the Electricity Distribution and Transmission Improvement Project for Pakistan are to: (i) strengthen the capacity of the distribution and transmission networks to meet increasing electricity demand in the selected areas more efficiently and with better reliability and quality; and (ii) strengthen institutional capacity of the selected distribution companies and support other priority areas of the power sector reform. The project includes the following components: (i) physical strengthening of distribution networks operated by four distribution companies (Hyderabad Electric Supply Company (HESCO), Islamabad Electric Supply Company (IESCO), Lahore Electric Supply Company (LESCO), and Multan Electric Power Supply Company (MEPCO); (ii) removing some bottlenecks in the transmission grid, operated by National Transmission and Dispatch Company (NTDC); (iii) technical assistance for capacity building, specialized studies, energy efficiency, and sector reform; and (iv) a pilot energy efficiency program, involving installation of energy saving equipment at the customer level.**
|
 |
 |
 |
 |
|
| |
Last Updated September 09 2010
|  |
Available Project Documents***
For a short project overview, please consult the Project Information Document if available.
|
 |
| |
 |
Financing Agreement (), Vol. -14-JUL-2008
|
 |
Loan Agreement (), Vol. -14-JUL-2008
|
 |
Project Appraisal Document (PAD), Vol.1 -22-MAY-2008
|
 |
Environmental Assessment (EA), Vol.11 -01-DEC-2007
|
 |
Resettlement Plan (RPL), Vol.4 -01-DEC-2007
|
 |
Environmental Assessment (EA), Vol.9 -01-JUL-2007
|
 |
Environmental Assessment (EA), Vol.10 -01-JUL-2007
|
 |
Environmental Assessment (EA), Vol.8 -01-JUL-2007
|
 |
Resettlement Plan (RPL), Vol.3 -01-JUL-2007
|
 |
Environmental Assessment (EA), Vol.7 -01-DEC-2006
|
 |
Environmental Assessment (EA), Vol.6 -01-SEP-2006
|
 |
Environmental Assessment (EA), Vol.5 -01-SEP-2006
|
 |
Environmental Assessment (EA), Vol.4 -01-SEP-2006
|
 |
Resettlement Plan (RPL), Vol.2 -01-SEP-2006
|
 |
Environmental Assessment (EA), Vol.3 -01-AUG-2006
|
 |
Environmental Assessment (EA), Vol.1 -01-AUG-2006
|
 |
Resettlement Plan (RPL), Vol.1 -01-AUG-2006
|
 |
Environmental Assessment (EA), Vol.2 -01-JUL-2006
|
 |
Integrated Safeguards Data Sheet (ISDS), Vol.1 -21-SEP-2005
|
 |
Integrated Safeguards Data Sheet (ISDS), Vol.1 -15-SEP-2005
|
 |
Project Information Document (PID), Vol.1 -12-SEP-2005
|
|
| |
 |
 |
 |
| Contract Award Information |
 |
| |
| Click here to see contract award information about this project. |
|
|
*Commitment at Board in USD$ millions. Does not reflect any cancellations. Pipeline and dropped projects display the forecast amount. Total project cost includes non-Bank funding.
** The project summary is drawn from the PAD, SAR, or PGD abstract and may not accurately reflect the project's current nature.
*** Project documents are posted to this website as soon as they reach certain milestones (more info.). For example, Project Appraisal Documents are processed and made available through this website a few days after Board approval. If you find that a report which should be here is unavailable, contact Infoshop .
|
|
|
|